Why Us

  • A Wide Spectrum Of Skills & Experience.
  • Committed to Quality.
  • Satisfaction Guaranteed.
  • High Touch Communication.
Read About Us

Quick Contact

    Contac us for Any Technical Data Required

    GRP Lining

    The working area will be clear and free of all contaminants. Moisture must be
    eliminated from the working area for successful GRP application. All
    hydrocarbon substances such as oils and lubricants will be removed for perfect
    ad-hesion. Any other surface impurities will also be removed.
    Cleaning may include brooms brushes vacuum cleaners for the removal of
    heavy and fine particles.

    Materials will be stored in a manner to avoid spills causing staining.
    Edges will chamfer, and corners rounded with the prescribed filler before the
    lining is applied. Imperfections will be rectified with the use of resins suitable
    for the GRP application.

    A bonding coat such as will be applied thinly to the working area to assist the
    chopped strands mat adherence to the working surface.
    After the bonding coat is cured, the chopped mat strands will be applied to
    make sure that the CSM is sufficiently wet for good application. Ensure enough
    impregnation of the CSM to avoid the exothermic heat.
    A second layer of the CSM can be applied again using the steel roller when the
    first layer is sufficiently cured.
    Approximately Four layers will be required to achieve the depth of 4mm GRP.
    It is recommended to use 50mm overlapping for the laminating process.
    When complete and sufficiently cured the surface will be inspected for
    anomalies such as air pockets and exposed matting. Remedial work should be
    conducted using sanders if required.
    When complete and signed off as complete and in compliance by the QA/QC a
    final gel coat will be applied using glass fibre tissue.
    The gel coat should have the properties of anti-corrosion properties and
    provide a smooth surface in compliance with the job order.
    The covering slap will require just two coatings of the gel coat to provide
    adequate protection.
    When the installation is complete and working materials such as tool and
    access platforms will be removed from the working area.
    The floor application of the GRP will now follow the same protocol as the walls.
    Drainage systems and catchment areas will be also GRP lined to a depth of
    4mm in compliance with the original drawings.

    Highlights

    • Non-Conductive Properties.
    • Resistant to Corrosion
    • Weight Advantages
    • High Strength
    • Economy

    We started V CARE WATERPROOFING years ago – Per a recent study, our customers say they would refer V CARE WATERPROOFING for best Waterproofing Solutions. (Based on actual customers surveyed)

    Contact Us

    Contact us

    We've Completed More Than Thousand Home-improvement Jobs Nationwide With Professionalism, Quality And Customer Service Always In Mind.